Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact

Shipboard Plate and Construction Terms

Shipboard plate and construction terms

‘A’ Frame – A support structure to provide rigidity to the shaft of a twin-propeller construction. It is shaped like a turned-over ‘A’, hence its name, where the propeller shaft is supported at the apex of the structure.Aft Peak Tank – A water tank set right aft of the vessel. It will either be a designated freshwater tank or a ballast water tank used for adjusting the ship’s trim.Beam Knees – Triangular steel plates secured between beams or half-beams and the side frames. They tend to compensate for racking stresses and localised stresses from heavyweights.Beams – These are usually in … [Read more...]

By Capt. Angad S Cheema Filed Under: Ship Construction Tagged With: aft peak tank, beam, floor, frames, ganger, garboard, gusset, keel, margin plate, oxter, panting, shell, Ship Construction, stem, strake

mariner-gps
Sail Time
Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

Visual Storm (Cyclone) Warning Signals for Indian Sea Ports

Twilight

Condition Assessment Scheme (CAS)

Condition Assessment Scheme (CAS)

Part C Lights and Shapes

Rule 22 – Visibility of lights

Echo Sounder

Echo Sounder – Principle, Working & Errors

Part C Lights and Shapes

Rule 30 – Anchored vessels and vessels aground

Part F - Verification of Compliance

Rule 40 – Application

Cold Work

Part C Lights and Shapes

Rule 31 – Seaplanes

The Procedure For Transferring The Registry

Harmonized System of Survey and Certification

Harmonized System of Survey and Certification (HSSC)

Double Hull

Types of Double Hull Tankers

Passage Planning

Passage Planning in or near ice limit

lifejacket

SOLAS REQUIREMENT’s FOR LIFEJACKET

Narrow Channels

Rule 9 – Narrow Channels


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors