Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact

Equipment Number

The holding power of an anchor determined through the calculation of Equipment Number or EN. The requirements of the various Classification Societies that are members of IACS have been unified within 'Unified Requirement A1' (UR A1).UR A1 provides a method of calculating the weight and size of the anchoring equipment required to be installed on-board through the calculation of the Equipment Number (EN):EN =    Δ²/³ + 2.0 hB + ( A/10 )Where:Δ = moulded displacement, in tonnes, to the Summer Load WaterlineB = moulded breadth in metersh= freeboard in meters, plus the sum … [Read more...]

By Cult of Sea

Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

Solar System

Solar system and Kepler’s law of Planetary Motion

Part C Lights and Shapes

Rule 25 – Sailing vessels underway and vessels under oars

Master Pilot Exchange – Duties, Responsibilities and Elements of effective Relationship

Vegetable, Palm and Soybean/Sunflower Oils – Carriage on Tankers

Part A - General

Rule 3 – General Definitions

Echo Sounder

Echo Sounder – Principle, Working & Errors

Deck Cargoes

Deck Cargoes

Part B - Section 1

Rule 10 – Traffic separation schemes

Part D - Sound and Light Signals

Rule 33 – Equipment for sound signals

Ship's Waterplane, Block, Midship and Prismatic Coefficient

Coefficients of Form – Ship’s Waterplane, Block, Midship and Prismatic Coefficient

SART

What is SART – Search and Rescue Radar Transponder?

History of oil transportation at sea

Notice of Readiness cover

Notice of Readiness (NOR) – Definition, Contents & Requirements

Part B - Section 2

Rule 18 – Responsibilities between vessels

Part A - General

Rule 1 – Application


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors