Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact
You are here: Home / glossary / Steadying lines

Steadying lines

Steadying lines

Created OnFebruary 6, 2018
byCult of Sea
Print
You are here:
  • Glossary
  • S
  • Steadying lines
< Back to Glossary Index

Cordage of up to about 24 mm in size, secured in adequate lengths to the load being lifted in order to provide stability and a steadying influence to the load when in transit from the quay to ship or ship to barge. Larger, heavier loads may use steadying tackles for the same purpose. However, these are more often secured to a collar/saucer arrangement, above the lifting hook, as opposed to being secured to the load itself. Tackles are rove with FSWR, not fibre cordage.

 

Related:

  • Dreadage or Dreading Clause
  • Hog (Hogging)
  • Arrived ship
  • Stability information booklet
  • Timber
  • Grab discharge

By Cult of Sea

Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

The provisions of MERCHANT SHIPPING ACT 1958 regarding Certificate of Registry

Part F - Verification of Compliance

Rule 41 – Verification of compliance

Magnetic Compass and Ships Magnetism

Magnetic Compass & Ship Magnetism – Simplified Explanation

Part C Lights and Shapes

Rule 22 – Visibility of lights

Cargo Conditioning, Reliquefaction – Gas Tankers

Ship's magnetic compass

Ship’s Magnetic Compass – Dry and Wet Compass with their care, maintenance and bubble removal

Hatch Covers

Hatch Cover and Access Lids

Principles of Ship Handling

Passage Planning

Passage Planning

ship-speed

Slow Speed Control

Leave

Entitlement to leave – MLC 2006

Echo Sounder

Echo Sounder – Principle, Working & Errors

Propeller Cavitation

Propeller Cavitation Explained – Cause, Types, Effects & Avoidance

Liferaft – General Requirements

Annex

ANNEX IV – Distress Signals


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors