Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact
You are here: Home / glossary / Intaken measure

Intaken measure

Intaken measure

Created OnMarch 2, 2018
byCult of Sea
Print
You are here:
  • Glossary
  • I
  • Intaken measure
< Back to Glossary Index

This expression can occur especially in charterparties for timber. Timber cargoes are generally measured by volume because the stowage factors of many types of timber are high, especially the softwoods, and also the timber may contain considerable moisture content. These factors cause the ship’s cargo spaces to be filled before loading “down to her marks”, (that is, its deadweight tonnage capacity based on the “loadlines”.) Owing to the number of places of origin of timber, different measurement systems are in use and this can cause problems in chartering if the parties involved are not familiar with the system in use. In most cases, it is probably best to leave the details of measurement to specialists. The freight is payable on the intaken measure.

Related:

  • Dreadage or Dreading Clause
  • Arrived ship
  • Timber
  • Cargo Capacity
  • COA (Contract of Affreightment)
  • Grain capacity

By Cult of Sea

mariner-gps
Sail Time
Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

Part C Lights and Shapes

Rule 23 – Power-driven vessels underway

AIS network - fleetmon.com

AIS (Automatic Identification System)

Hot work on ships

Hot Work – Definition, Responsibility, Process and Risks On-board Ships

Double Hull

Types of Double Hull Tankers

Precautions while Entering and Navigating within Ice Limits

wages

Wages – MLC 2006

Heavy Lift

Heavy Lift Cargo – Precautions and Stability Changes Onboard Merchant Ships

Piping Arrangement – Conventional Oil Tanker Basics

Ship’s Routeing – Organize and Improve Shipping Movement

Liferaft – General Requirements

Epirb

EPIRB – Performance Standards (406Mhz)

Technical Aspects of GMDSS Equipments

Technical Aspects of GMDSS Equipments – Propagation, Modulation, Terrestrial Equipment & Antenna

How NAVTEX Works

Refrigeration Principle, Cargo and Systems

Anti Exposure Suit


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors